Skip to main content

Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan and Profile: Academy Boulevard and South Bear Tributary Arroyo Desiltation Pond, undated

 Item — tube: 20
Identifier: 2.19.5I

Scope and Contents

Blueprint on Bond

Dates

  • Creation: undated

Language of Materials

From the Collection:

Material in English

Conditions Governing Access

No restrictions on use, except: not available through interlibrary loan.

Extent

From the File: 23 tubes

Repository Details

Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository

Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)