Detailed views of leaks across the right abutment rock face, 1975-1976
Scope and Contents
Page 8a: Three Color Photos [9/10/75] Right abutment rock face from 80’ upstream to 75’ upstream showing rock condition and cleanup. [9/23/75] Right abutment from 10’ downstream to 50’ downstream showing rock face cleanup and condition. [6/5/76] View of right abutment and leak in dam as seen from the north-west corner of the powerhouse. Page 8b: Three Color Photos [6/5/76] View of the leak at the right abutment showing the water coming out of the rock into the riprap stockpile. [6/5/76] A close-up view of the water running out of the right abutment. [6/5/76] View of the downstream face of the dam after the second leak started.
Dates
- 1975-1976
Conditions Governing Access
No restrictions on access, except: not available through interlibrary loan.
Extent
From the Collection: .25 Linear Feet (1 box)
Language of Materials
From the Collection: English
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu