Skip to main content

Views of excavation work in Zones 2 and 5, 1973

 Item — Box: 1, Folder: 2
Identifier: 5

Scope and Contents

Page 13a: Two Greyscale Photos [6/25/73] View of upstream wall of right keyway trench. [6/26/73] View showing placement of Zone 2 material, Station 17+50 to 18+50 100 feet to 600 feet downstream from centerline of dam. Page 13b: Two Greyscale Photos [7/2/73] View of keyway trench on right abutment, and Zone 5 and Zone 2 excavation in cutoff trench. [7/11/73] View of right abutment after Zone 5 material has been removed and scalers are cleaning up.

Dates

  • 1973

Conditions Governing Access

No restrictions on access, except: not available through interlibrary loan.

Extent

From the Collection: .25 Linear Feet (1 box)

Language of Materials

From the Collection: English

Repository Details

Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository

Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)