Skip to main content

Views of unnamed laborers, and details of the Cutoff Trench, 1973

 Item — Box: 1, Folder: 2
Identifier: 9

Scope and Contents

Page 17a: Two Greyscale Photos [9/26/73] View of Contractor getting ready to place concrete in grout cap trench Station 16+49 to 16+28. [10/24/73] View of laborers hand compacting backfill around toe drain pump sump at Station 19+70, 175 feet upstream from center line of dam. Page 17b: Two Greyscale Photos [10/9/73] View of grout cap looking toward right abutment in Cutoff Trench. [10/18/73] View of second load of Zone 1 material placed in Cutoff Trench with conveyor contractor has set up.

Dates

  • 1973

Conditions Governing Access

No restrictions on access, except: not available through interlibrary loan.

Extent

From the Collection: .25 Linear Feet (1 box)

Language of Materials

From the Collection: English

Repository Details

Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository

Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)