Views of unnamed laborers, and details of the Cutoff Trench, 1973
Scope and Contents
Page 17a: Two Greyscale Photos [9/26/73] View of Contractor getting ready to place concrete in grout cap trench Station 16+49 to 16+28. [10/24/73] View of laborers hand compacting backfill around toe drain pump sump at Station 19+70, 175 feet upstream from center line of dam. Page 17b: Two Greyscale Photos [10/9/73] View of grout cap looking toward right abutment in Cutoff Trench. [10/18/73] View of second load of Zone 1 material placed in Cutoff Trench with conveyor contractor has set up.
Dates
- 1973
Conditions Governing Access
No restrictions on access, except: not available through interlibrary loan.
Extent
From the Collection: .25 Linear Feet (1 box)
Language of Materials
From the Collection: English
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu