Skip to main content

Details of cleanup work, including photos of machinery damages, 1974

 Item — Box: 1, Folder: 3
Identifier: 4

Scope and Contents

Page 22a: Two Greyscale Photos [7/9/74] Crew cleaning up on walls of cutoff trench right abutment about station 4+75, downstream side. [7/24/74] View of right abutment facing station 15+00, 100 to 250 feet upstream showing loose rock on face. Page 22b: Two Greyscale Photos [7/25/74] View of tower at 9 a.m. on 7/25/74 showing damage to leg caused by Scraper #641 hitting it at approximately 2:30 a.m. on 7/25/74 graveyard shift. [7/11/74] Right abutment, elevation 5045 to elevation 5090, showing broken rock and traces of grout leaks from grout hole located 15+94 downstream curtain.

Dates

  • Creation: 1974

Conditions Governing Access

No restrictions on access, except: not available through interlibrary loan.

Extent

From the Collection: .25 Linear Feet (1 box)

Language of Materials

From the Collection: English

Repository Details

Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository

Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)