Views of the right abutment key trench being filled, 1975
Scope and Contents
Page 27a: Two Greyscale Photos [5/8/75] Downstream right abutment and zone 1 showing workmen cleaning up the abutment for 1 material. [6/16/75] Right keyway station 4+20 showing caves in downstream wall bring back filled with concrete using crane and 2 cu. yd. bucket. Page 27b: Two Greyscale Photos [7/17/75] View of the right abutment key trench, station 8+50, looking towards auxiliary outlet works tunnel access shaft and spillway inlet. [7/9/75] Right abutment keyway trench being backfilled with compacted Zone 1 material.
Dates
- Creation: 1975
Conditions Governing Access
No restrictions on access, except: not available through interlibrary loan.
Extent
From the Collection: .25 Linear Feet (1 box)
Language of Materials
From the Collection: English
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu