Tube 4
Container
Contains 198 Results:
Summerlin Parkway & Town Center Site Plan, undated
Item — tube: 4
Identifier: 4.4.2
Scope and Contents
Print on Bond
Dates:
undated
Summerlin Village 7 Unit No. 1; Design Workshop Review, 1993 June 11
Item — tube: 4
Identifier: 4.5.1 A
Scope and Contents
Blueprint on Bond
Dates:
1993 June 11
Summerlin Village 7 Unit No. 1; Design Workshop Review, 1993 June 11
Item — tube: 4
Identifier: 4.5.1 B
Scope and Contents
Blueprint on Bond
Dates:
1993 June 11
Village One North Parcel Development Concept and Criteria, 1989 February 15
Item — tube: 4
Identifier: 4.6.4
Scope and Contents
Print on Vellum
Dates:
1989 February 15
Entry Feature at Town Center Drive and Mustache Road, 1989 February 27
Item — tube: 4
Identifier: 4.6.5
Scope and Contents
Ink & Marker on Trace
Dates:
1989 February 27
Town Center and Mustache Road Entry Feature, 1989 February 27
Item — tube: 4
Identifier: 4.6.6
Scope and Contents
Print on Vellum
Dates:
1989 February 27
Village One and Seven Entry Feature with Town Center Drive Streetscape Wall, 1989 February 27
Item — tube: 4
Identifier: 4.6.7
Scope and Contents
Print on Vellum
Dates:
1989 February 27
Mustache Road Landscape Plan, 1989 February 25
Item — tube: 4
Identifier: 4.6.8
Scope and Contents
Ink on Trace
Dates:
1989 February 25
Ground Plane Planting and Gravel Mulch Plan Streetscape Plan, 1989 February 25
Item — tube: 4
Identifier: 4.6.9
Scope and Contents
Ink on Trace
Dates:
1989 February 25
Mustache Road at Rampart Entry Feature Elevation, 1989 February 25
Item — tube: 4
Identifier: 4.6.10
Scope and Contents
Ink on Trace
Dates:
1989 February 25