Tube 5
Container
Contains 192 Results:
Spot Elevations, undated
Item — tube: 5
Identifier: 1.6.3
Scope and Contents
Pencil on Mylar
Dates:
undated
Spot Elevations, undated
Item — tube: 5
Identifier: 1.6.4
Scope and Contents
Pencil & Ink on Blueprint on Bond
Dates:
undated
Road ROW and recommended 40 meter setback, undated
Item — tube: 5
Identifier: 1.6.5A-B
Scope and Contents
Ink on Mylar (2 sheets)
Dates:
undated
Road ROW and recommended 40 meter setback revision, undated
Item — tube: 5
Identifier: 1.6.6A-B
Scope and Contents
Ink on Mylar (2 sheets)
Dates:
undated
Site grading plan, 1985 January
Item — tube: 5
Identifier: 1.6.7
Scope and Contents
Ink on Mylar
Dates:
1985 January
Road ROW and recommended 40 meter setback; Sheet 2, undated
Item — tube: 5
Identifier: 1.6.8
Scope and Contents
Ink on Mylar
Dates:
undated
Existing site topography, 1986 January
Item — tube: 5
Identifier: 1.6.9A-C
Scope and Contents
Ink on Mylar (3 sheets)
Dates:
1986 January
Existing site topography, undated
Item — tube: 5
Identifier: 1.6.10
Scope and Contents
Print on Mylar
Dates:
undated
Existing site topograph, 1985 January
Item — tube: 5
Identifier: 1.6.11
Scope and Contents
Print on Mylar
Dates:
1985 January
Existing site topography, revised, 1985 June
Item — tube: 5
Identifier: 1.6.12
Scope and Contents
Print on Mylar
Dates:
1985 June