Skip to main content

Tube 5

 Container

Contains 192 Results:

Starwood Ranch Lot Two; Construction Documents Progress Print, 1990 June 5

 Item — tube: 5
Identifier: 3.5.4.C
Scope and Contents

Retaining Wall/Fence Elevation and Tennis House/Retaining Wall/Fence Elevation. Blueprint on Bond

Dates: 1990 June 5

Starwood Ranch Lot Two; Construction Documents Progress Print, 1990 June 5

 Item — tube: 5
Identifier: 3.5.4.D
Scope and Contents

Guard Rail Elevation, Gate Elevation, Sandstone Paving/Steps, Retaining Wall @ Tennis Court, Tennis Net Post, Paving Over Structure, Concrete Band/Fence Post Connection, Tennis Court/Light Connection/FootingPrinted. Blueprint on Bond.

Dates: 1990 June 5