Tube 20
Container
Contains 197 Results:
Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Wire Enclosed Riprap Details, undated
Item — tube: 20
Identifier: 2.19.5Q
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Structural Detail, undated
Item — tube: 20
Identifier: 2.19.5R
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP, undated
Item — tube: 20
Identifier: 2.19.5S
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Special Wingwall and Headwall for 84" Diameter RCP, undated
Item — tube: 20
Identifier: 2.19.5T
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; Title Sheet, undated
Item — tube: 20
Identifier: 2.19.6A
Scope and Contents
Print on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; General Notes, undated
Item — tube: 20
Identifier: 2.19.6B
Scope and Contents
Print on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; Key Map, undated
Item — tube: 20
Identifier: 2.19.6C
Scope and Contents
Print on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; Plat/Survey Control, undated
Item — tube: 20
Identifier: 2.19.6D
Scope and Contents
Print on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; Plat/Survey Control, undated
Item — tube: 20
Identifier: 2.19.6E
Scope and Contents
Print on Bond
Dates:
undated
Construction Plans for Subdivision Phase I-A; Plat/Survey Control, undated
Item — tube: 20
Identifier: 2.19.6F
Scope and Contents
Print on Bond
Dates:
undated