Tube 20
Container
Contains 197 Results:
The Crossing Entry Concept in Color, 1992 September 24
Item — tube: 20
Identifier: 4.33.22
Scope and Contents
Pen and Colored Pencil on Bond
Dates:
1992 September 24
The Crossing Wall Concepts in Color, 1992 September 16
Item — tube: 20
Identifier: 4.33.23
Scope and Contents
Pen and Colored Pencil on Bond
Dates:
1992 September 16
The Crossing Photo, 1992 September 16
Item — tube: 20
Identifier: 4.33.24
Scope and Contents
Images on Bond
Dates:
1992 September 16
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile, undated
Item — tube: 20
Identifier: 2.19.5C
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan & Profile: Academy and North Bear Tributary Arroyo Desiltation Pond, undated
Item — tube: 20
Identifier: 2.19.5E
Scope and Contents
Blueprint on Bond
Dates:
undated
Cucumber Creek, undated
File — tube: 20
Identifier: LXXVIII
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated
Mylar's, Illustrative, Grading, Schedule, undated
File — tube: 20
Identifier: LXXIX
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated