Tube 33
Container
Contains 27 Results:
Summerlin Phase 1, undated
Item — tube: 33
Identifier: 4.66.18
Scope and Contents
Marker on Bond
Dates:
undated
Summerlin Phase 1, undated
Item — tube: 33
Identifier: 4.66.19
Scope and Contents
Marker on Bond
Dates:
undated
Phase One Utilities, 1988 September 29
Item — tube: 33
Identifier: 4.66.20
Scope and Contents
Tape on Bond
Dates:
1988 September 29
Rodeo Entry Master Plan, undated
File — tube: 33
Identifier: LXXXIX
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated
Design Development, undated
File — tube: 33
Identifier: XXVI
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated
Spillway, undated
File — tube: 33
Identifier: LXXIII
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated