Central-St. George Project minutes, 2012 January 10-2016 February 16
Scope and Contents
The focus of the Central-St. George Project is to improve the quality and reliability of transmission service to the members in southwestern Utah. The project includes a 345 to 138 kV Central substation, 21 miles of double circuit 138 kV transmission line from the Central substation to the St. George substation, four miles of 138 kV transmission line from the St. George substation to the 138 to 69 kV River substation, 12 miles of transmission line connecting the river substation to Hurricane City and other system upgrades. The project also owns jointly with PacifiCorp 21 miles of double circuit 345 kV transmission line from Red Butte substation to St. George substation.
Dates
- 2012 January 10-2016 February 16
Conditions Governing Access
No restrictions on use, except: not available through interlibrary loan.
Extent
From the Collection: 118.5 Linear Feet (238 boxes and 165 digital files)
Language of Materials
From the Collection: English
Creator
- From the Collection: Utah Associated Municipal Power Systems (UAMPS) (Organization)
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu