Craig-Mona Project minutes, 1988-2020
Scope and Contents
The Craig-Mona Project involves the transmission capability of two interconnected 345 kV transmission lines. UAMPS owns a 15 percent interest in the first segment, running west from Craig, Colorado to the Bonanza Power Plant in northeast Utah. UAMPS holds an entitlement to 54 megawatts of capacity in the second segment from Bonanza to an interconnection at Mona, Utah.
Dates
- 1988-2020
Conditions Governing Access
No restrictions on use, except: not available through interlibrary loan.
Extent
From the Collection: 118.5 Linear Feet (238 boxes and 165 digital files)
Language of Materials
From the Collection: English
Creator
- From the Collection: Utah Associated Municipal Power Systems (UAMPS) (Organization)
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu