Central-St. George Project minutes, 1991 January 15-1992 March 30
File — Box: 71
Identifier: Subseries 2
Scope and Contents
From the Sub-Series:
The focus of the Central-St. George Project is to improve the quality and reliability of transmission service to the members in southwestern Utah. The project includes a 345 to 138 kV Central substation, 21 miles of double circuit 138 kV transmission line from the Central substation to the St. George substation, four miles of 138 kV transmission line from the St. George substation to the 138 to 69 kV River substation, 12 miles of transmission line connecting the river substation to Hurricane...
Dates:
1991 January 15-1992 March 30