Box 82
Container
Contains 2 Results:
Central-St. George Project minutes, 2020 April 14-2020 December 15
File — Box: 82
Identifier: Subseries 2
Scope and Contents
From the Sub-Series:
The focus of the Central-St. George Project is to improve the quality and reliability of transmission service to the members in southwestern Utah. The project includes a 345 to 138 kV Central substation, 21 miles of double circuit 138 kV transmission line from the Central substation to the St. George substation, four miles of 138 kV transmission line from the St. George substation to the 138 to 69 kV River substation, 12 miles of transmission line connecting the river substation to Hurricane...
Dates:
2020 April 14-2020 December 15
CRSP Project minutes, 1995 July 19-1997 February 18
File — Box: 82
Identifier: Subseries 3
Scope and Contents
From the Sub-Series:
The Colorado River Storage Project (CRSP) is federally owned and operated by the United States Bureau of Reclamation. One purpose of CRSP is the production of hydroelectric capacity and energy. The Western Area Power Administration (WAPA) markets and transmits CRSP power in 15 western and central states. WAPA has 10,000 megawatts of capacity in 56 power plants. UAMPS acts as a single purchasing agent for our members that have a firm allocation of CRSP capacity and energy that is purchased...
Dates:
1995 July 19-1997 February 18