Payson Project minutes, 2006 April 18-2007 July 17
File — Box: 139
Identifier: Subseries 15
Scope and Contents
From the Sub-Series:
The Payson Project represents the Nebo Power Station, a 140-megawatt combined cycle gas-fired generating facility in Payson City, Utah. The facility began operating in June 2004. The facility includes a General Electric Frame 7EA gas turbine, a heat recovery steam generator, a steam turbine, condensers and a cooling tower along with related 138 kV and 46 kV electric substations and transmission lines and gas pipelines.
Dates:
2006 April 18-2007 July 17