Skip to main content

Box 147

 Container

Contains 3 Results:

Payson Project minutes, 2020 September 15-2020 December 15

 File — Box: 147
Identifier: Subseries 15
Scope and Contents From the Sub-Series:

The Payson Project represents the Nebo Power Station, a 140-megawatt combined cycle gas-fired generating facility in Payson City, Utah. The facility began operating in June 2004. The facility includes a General Electric Frame 7EA gas turbine, a heat recovery steam generator, a steam turbine, condensers and a cooling tower along with related 138 kV and 46 kV electric substations and transmission lines and gas pipelines.

Dates: 2020 September 15-2020 December 15

Payson Project Nebo Budget Ad Hoc minutes, 2005 July 18-2007 November 08

 File — Box: 147
Identifier: Subseries 15
Scope and Contents From the Sub-Series:

The Payson Project represents the Nebo Power Station, a 140-megawatt combined cycle gas-fired generating facility in Payson City, Utah. The facility began operating in June 2004. The facility includes a General Electric Frame 7EA gas turbine, a heat recovery steam generator, a steam turbine, condensers and a cooling tower along with related 138 kV and 46 kV electric substations and transmission lines and gas pipelines.

Dates: 2005 July 18-2007 November 08

Pool Project minutes, 1992 April 15-1997 December 16

 File — Box: 147
Identifier: Subseries 16
Scope and Contents From the Sub-Series:

The Pool Project provides an hourly resource clearinghouse where UAMPS acts as agent for the scheduling and dispatch of resources including the purchase of any resources and/or reserves required to meet each member’s electric system load, the sale of any member’s resources which are deemed surplus to meet its electric system load and the utilization of transmission rights to effect resource deliveries to, and sales by, each member.

Dates: 1992 April 15-1997 December 16