Teton Dam Construction, black and white photographs, 1971-1973
This collection contains the unbound pages of a photograph album, following the construction of the Teton Dam in Idaho. Included are captions with details of location, subject, and photographer. Most of the photos were taken by Bruce Beckley and R. Weisser, and P. Aberle, B. Bockstruck, W. Andrew, J. Ringel, R. Pittard, B. Holbert, L. Rogers, G. Brannson.
Views of various test pits and the surrounding area, 1971
Page 9a: Two Greyscale Photos [10/5/71] View of downstream portal of River Outlet Works. [10/5/71] View of bottom of canyon at dam axis. Page 9b: Two Greyscale Photos [10/5/71] View of Test Pit C-202. [10/5/71] View of Test Pit C-201.
Detailed views of excavation work and areas of concern, 1972-1973
Page 10a: Two Greyscale Photos [10/25/72] View of grout cap excavation station 11+60 to 11+85 in Foundation Key trench. [10/25/72] Workers are scaling Foundation Key trench walls between station 11+95 to 12+50. Page 10b: Two Greyscale Photos [1/18/73] View of Foundation Key trench in right abutment. [2/1/73] View of unstable rock conditions caused by undercutting by contractor above right abutment access road approximately 300 ft. upstream from station 15+00 on right abutment Keyway.
Views of unnamed laborers, and details of the right abutment, 1973
Views of work on the right keyway trench, 1973
Views of excavation work in Zones 2 and 5, 1973
Page 13a: Two Greyscale Photos [6/25/73] View of upstream wall of right keyway trench. [6/26/73] View showing placement of Zone 2 material, Station 17+50 to 18+50 100 feet to 600 feet downstream from centerline of dam. Page 13b: Two Greyscale Photos [7/2/73] View of keyway trench on right abutment, and Zone 5 and Zone 2 excavation in cutoff trench. [7/11/73] View of right abutment after Zone 5 material has been removed and scalers are cleaning up.
Views of grout cap trench, 1973
Assorted views of right abutment, 1973
Page 15a: Two Greyscale Photos [8/8/73] View of right abutment showing overhanging rock ledge at Elevation 5006.0 before being shot. [8/9/73] View of right abutment and cleaning up work still being done. Page 15b: Two Greyscale Photos [8/13/73] View of right abutment and two air drills line drilling overhanging rock ledge. [8/21/73] View of clay layers approximately 20 feet upstream from centerline of dam, Station 19+50 to 18+75.
Views of grout cap trench and water seepage, 1973
Page 16a: Two Greyscale Photos [8/21/73] View of water seeping out of pervious material (sand and gravel) above clay bed, 210 feet upstream from centerline of dam, Station 22+30 to 22+50. [9/27/73] View of the cutoff trench showing grout cap complete across bottom. Page 16b: Two Greyscale Photos [9/17/73] Grout cap trench, Station 17+80 to 19+20. [8/22/73] View of grout cap trench after drilling, Station 17+50 to 17+75.