Skip to main content

Craig-Mona Project minutes, 1988 August 31-1990 March 21

 File — Box: 90
Identifier: Subseries 4

Scope and Contents

From the Sub-Series:

The Craig-Mona Project involves the transmission capability of two interconnected 345 kV transmission lines. UAMPS owns a 15 percent interest in the first segment, running west from Craig, Colorado to the Bonanza Power Plant in northeast Utah. UAMPS holds an entitlement to 54 megawatts of capacity in the second segment from Bonanza to an interconnection at Mona, Utah.

Dates

  • 1988 August 31-1990 March 21

Conditions Governing Access

No restrictions on use, except: not available through interlibrary loan.

Extent

From the Collection: 118.5 Linear Feet (238 boxes and 165 digital files)

Language of Materials

From the Collection: English

Creator

Repository Details

Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository

Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)