Veyo Heat Recovery Project minutes, 2015 January 21-2020 April 14
File — Box: 174
Identifier: Subseries 19
Scope and Contents
From the Sub-Series:
The Veyo Heat Recovery Project uses waste heat to power a 7.8 MW energy recovery generation system. The Project is located adjacent to the existing Veyo Compressor Station which is owned and operated by the Kern River Gas Transmission Company. The Project began commercial operation in May 2016.
Dates
- 2015 January 21-2020 April 14
Conditions Governing Access
No restrictions on use, except: not available through interlibrary loan.
Extent
From the Collection: 118.5 Linear Feet (238 boxes and 165 digital files)
Language of Materials
From the Collection: English
Creator
- From the Collection: Utah Associated Municipal Power Systems (UAMPS) (Organization)
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Contact:
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu