Skip to main content

Box 174

 Container

Contains 1 Result:

Veyo Heat Recovery Project minutes, 2015 January 21-2020 April 14

 File — Box: 174
Identifier: Subseries 19
Scope and Contents From the Sub-Series:

The Veyo Heat Recovery Project uses waste heat to power a 7.8 MW energy recovery generation system. The Project is located adjacent to the existing Veyo Compressor Station which is owned and operated by the Kern River Gas Transmission Company. The Project began commercial operation in May 2016.

Dates: 2015 January 21-2020 April 14