Box 1
Contains 30 Results:
Views of keyway trench open rock joint, 1973-1974
Page 19a: Two Greyscale Photos [10/16/73] View of bottom of cutoff trench station 18+00 to 17+75. [2/14/74] View of keyway trench open rock joint at station 4+16, downstream side of keyway, elevation 5256.0. Page 19b: Two Greyscale Photos [2/14/74] View of keyway trench open rock joint, looking inside hole at station 4+45, upstream setting, 2 feet inside looking into hole. [2/14/74] View of keyway trench open rock joint at station 3+45, showing downstream side of keyway.
Views of unnamed laborers and cleanup efforts, 1974
Assorted details of cleanup work and machinery, 1974
Page 21a: Two Greyscale Photos [4/8/74] View of compacting of zone 1 material on bench below conveyor tower with sheepfoot roller. [3/27/74] From 22+00, centerline grout cap looking at right abutment being cleaned off by labor crew. Page 21b: Two Greyscale Photos [4/25/74] View of final cleanup in keyway trench, station 3+00 to 4+50. [7/2/74] Hydraulic hammer used for special compactor along abutment and around tower supports.
Details of cleanup work, including photos of machinery damages, 1974
Detailed views of right abutment cleanup, 1974
Page 23a: Two Greyscale Photos [8/13/74] View of right key trench showing cleanup completed by contractor. [8/16/74] View of rock face 200 feet upstream to 300 feet upstream showing abutment cleanup, right abutment. Page 23b: Two Greyscale Photos [8/16/74] View of rock face 300 feet to 400 feet upstream showing right abutment cleanup. [8/26/74] Right abutment keyway showing drill track on the grout cap and access starway on the upstream side.
Detailed views of right abutment cleanup, including specific voids and cracks, 1974
Page 24a: Two Greyscale Photos [9/12/74] Void located at elevation 5085 on the left abutment 250 feet upstream of centerline. [10/11/74] Dam embankment from left abutment opposite of power-pumping plant. Page 24b: Two Greyscale Photos [10/11/74] Right abutment showing rock 260 to 300 feet upstream of centerline. [10/6/74] View of crack that required backfilling with grout, 250 feet upstream of centerline on left abutment, elevation 5106.
Views of open joints and cracks along the right abutment, 1974-1975
Page 25a: Two Greyscale Photos [11/14/74] View of open joints on the right abutment at elevation 5133, station 15+30, 250 feet upstream. [11/15/74] A void in the right abutment to be grouted at elevation 5140, 250 feet upstream, station 15+30. Page 25b: Two Greyscale Photos [11/14/74] View of open joint on the right abutment at elevation 5142, station 14+52, 90 feet upstream ready to be grouted. [4/10/75] Grout Cap - Station 10+25 showing close up of open joint in rock.
Assorted views of construction machinery, 1975
Views of the right abutment key trench being filled, 1975
Right key trench showing workmen cleaning up rock face prior to the placement of zone 1 in the key trench, undated
Page 28a: One Greyscale Photo [undated] Right key trench showing workmen cleaning up rock face station 9+25 prior to the placement of zone 1 in the key trench.